Project Completed In February 2021 Using ceEntek’s ce200SF-G UHPC
The Arthur Kill Avenue bridge over the Staten Island Rapid Transit (SIRT) is a critical access for Staten Island residents and to the SIRT station. When considering a rehabilitation of the bridge, maintaining traffic flow in both directions at all times and minimizing user inconvenience was a significant factor.
The existing deck was replaced with a new cast-in-place concrete deck with UHPC longitudinal closure pours of ceEntek’s ce200SF-G. This urgent replacement required casting of the UHPC closure pour during winter construction. ceEntek’s Cold Weather Practice’s Guide was followed for the project casting and the ce200SF-G was modified to provide early strength during winter construction.