ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
More
  • Home
  • About us
  • Products & Services
    • Products
    • Services
  • Sustainability
  • Technology
  • Markets
    • Onshore
    • Offshore
  • UHPC Blog
  • Updates
    • News
    • Project Profiles
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer
  • Home
  • About us
  • Products & Services
  • Sustainability
  • Technology
  • Markets
  • UHPC Blog
  • Updates
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer

US 52 OVER MUD CREEK

Project completed in Jul 2021 using ceEntek's ce200SF-G UHPC

  The US 52 bridge required a complete replacement due to its poor condition. The new bridge was planned to be constructed using an Accelerated Bridge Construction (ABC) method along with Prefabricated Bridge Elements and Systems (PBES) connected with UHPC to result in a smaller impact to traffic by reducing overall construction time (30-day full closure).


The construction of the bridge consisted of two phases. The first phase was to install new piers on top of steel H-Piles. The piers consisted of vertical panel sections connected with UHPC. The second phase was the installation of the precast desk panels with UHPC longitudinal closure pours using ceEntek’s ce200SF-G.

Download PDF