ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
More
  • Home
  • About us
  • Products & Services
    • Products
    • Services
  • Sustainability
  • Technology
  • Markets
    • Onshore
    • Offshore
  • UHPC Blog
  • Updates
    • News
    • Project Profiles
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer
  • Home
  • About us
  • Products & Services
  • Sustainability
  • Technology
  • Markets
  • UHPC Blog
  • Updates
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer

QUAIL-ROOST DR

Project completed in April 2021 using ceEntek's ce200SF-G

 The lateral post-tensioning in this 50+ year old bridge had corroded and deteriorated to a condition where all post-tensioning forces had disappeared and the side-by-side box-girders were no longer performing as an integral unit. There was a significant reduction in the ability for load sharing by adjacent girders.


FDOT decided to use hydro-demolition to remove the old grout between the box-girders, install new dowel bars, and cast UHPC to provide lateral connections between the box-girders and re-establish load-sharing.


During removal of the old asphalt, the sub-contractor removed a portion of the top concrete cover protecting the steel stirrups in the box girders. An emergency repair using ce200SF-t overlay was installed.

Download PDF