ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
More
  • Home
  • About us
  • Products & Services
    • Products
    • Services
  • Sustainability
  • Technology
  • Markets
    • Onshore
    • Offshore
  • UHPC Blog
  • Updates
    • News
    • Project Profiles
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer
  • Home
  • About us
  • Products & Services
  • Sustainability
  • Technology
  • Markets
  • UHPC Blog
  • Updates
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer

I-77 EXIT RAMP

Project completed in Jul 2021 using ceEntek's ce200SF-G UHPC

    The exit ramp’s rehabilitation was required due to the poor condition of the deck. This new bridge was planned to be constructed using an accelerated replacement method utilizing precast deck panels with UHPC 2.0 to reduce overall construction time thus minimizing traffic interruption. The replaced bridge deck then received a waterproofing membrane and asphalt riding surface before opening to traffic.

The reconstruction of the bridge deck consisted of the precast deck panels with UHPC connections, haunches, shear pockets, and live-load continuity over the center pier using ceEntek’s ce200SF-G. Integral to the panels, safety barriers were also cast and similarly connected with UHPC 2.0.

Download PDF