ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
ceEntek
Home
About us
Products & Services
  • Products
  • Services
Sustainability
Technology
Markets
  • Onshore
  • Offshore
UHPC Blog
Updates
  • News
  • Project Profiles
Team
Careers
Contact us
HSEQ
Downloads
Disclaimer
More
  • Home
  • About us
  • Products & Services
    • Products
    • Services
  • Sustainability
  • Technology
  • Markets
    • Onshore
    • Offshore
  • UHPC Blog
  • Updates
    • News
    • Project Profiles
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer
  • Home
  • About us
  • Products & Services
  • Sustainability
  • Technology
  • Markets
  • UHPC Blog
  • Updates
  • Team
  • Careers
  • Contact us
  • HSEQ
  • Downloads
  • Disclaimer

ARTHUR KILL OVER SIRT

Project completed in Feb 2021 using ceEntek's ce200SF-G UHPC

The Arthur Kill Avenue bridge over the Staten Island Rapid Transit (SIRT) is a critical access for Staten Island residents and to the SIRT station. When considering a rehabilitation of the bridge, maintaining traffic flow in both directions at all times and minimizing user inconvenience was a significant factor. 


The existing deck was replaced with a new cast-in-place concrete deck with UHPC longitudinal closure pours of ceEntek’s ce200SF-G. This urgent replacement required casting of the UHPC closure pour during winter construction. ceEntek’s Cold Weather Practice’s Guide was followed for the project casting and the ce200SF-G was modified to provide early strength during winter construction.